From network maintenance to electrical substation commissioning, explore six projects completed by our teams.
Open a project to explore its scope and challenges.
01 — Projects
Renewable energy
MAINTENANCE
Seigneurie de Beaupré wind farm
Boralex
Beaupré · 2020
Explore the project
MAINTENANCE
Seigneurie de Beaupré wind farm
Boralex
Beaupré · 2020
Explore the project
The project
At the Seigneurie de Beaupré wind farm, Supra Énergie carried out annual testing of the electrical substation and replaced 35 kV cable splices, scheduling the work around wind conditions to limit the impact of production interruptions.
Our scope of work
As part of the annual maintenance of the 315/35 kV high-voltage substation, Supra Énergie was tasked with testing the existing outdoor equipment. The work also included replacing 35 kV splices on the wind farm’s collector network.
Equipment involved
- 315 kV power transformer
- Grounding transformer
- 35 kV circuit breaker
- Disconnect switch
- Voltage and current transformers (VTs and CTs)
The challenge
The wind farm's output depends directly on the wind. The work date and sequence were therefore adapted to wind conditions to limit the outage's impact on energy production.
Supra Énergie’s contribution
- An experienced team
- Knowledge of the facility
- Fast, advanced test equipment
CONSTRUCTION AND COMMISSIONING
Lanfine wind farm
Borea
Lanfine · 2022
Explore the project
CONSTRUCTION AND COMMISSIONING
Lanfine wind farm
Borea
Lanfine · 2022
Explore the project
02 — Projects
Industrial
COMMISSIONING
Alcoa Deschambault electrical substation
Alcoa
Deschambault · 2021
Explore the project
COMMISSIONING
Alcoa Deschambault electrical substation
Alcoa
Deschambault · 2021
Explore the project
The project
Alcoa increased the capacity of its existing electrical substation by 500 MW. The project included the addition of a 480 MVA, 315 kV transformer, circuit breakers and disconnect switches, as well as a new control building with protection relays.
Our scope of work
Test and commission the new equipment, verify the control and automation systems, then commission the substation at the end of construction.
Equipment involved
- 315 kV power transformer
- 315 and 69 kV circuit breakers
- Disconnect switches
- VTs and CTs
- Protection relays
The challenge
Procurement delays cut the planned testing period in half, with no extension to the deadline. Additional team members and evening and weekend work enabled the project to be delivered on time.
Supra Énergie’s contribution
- Experienced team
- Turnkey service
- Knowledge of the facility
- Flexibility
COMMISSIONING
Finkl Steel plant
GE Power Conversion
Sorel · 2020–2021
Explore the project
COMMISSIONING
Finkl Steel plant
GE Power Conversion
Sorel · 2020–2021
Explore the project
The project
For GE Power Conversion, Supra Énergie tested an SVC at the Finkl Steel plant, then supported assembly quality assurance and stakeholder coordination through to final commissioning of the installation.
Our scope of work
The installation of a GE France SVC was intended to improve the plant’s power factor by replacing the existing passive capacitor bank. Supra Énergie was responsible for testing the outdoor equipment, thyristors and control panel. The scope also expanded to include installation quality assurance and coordination of the parties involved through final commissioning.
Equipment involved
- 45 kV circuit breaker
- Reactor
- Capacitor bank
- Disconnect switch
- Voltage and current transformers (VTs and CTs)
- Thyristors
- Protection relays
- Cooling unit
- Control panel
The challenge
Because this type of installation is uncommon in Quebec, the team provided installation support beyond the planned testing. With project management conducted remotely due to COVID-19, Supra Énergie coordinated the mechanical, civil engineering and electrical teams through to commissioning.
Supra Énergie’s contribution
- Experience with multiple SVC projects
- Fast, advanced test equipment
- The ability to adapt as the scope evolves
03 — Projects
Public utilities
COMMISSIONING
Jean-Dechêne electrical substation
Ville de Saguenay
Saguenay · 2020
Explore the project
COMMISSIONING
Jean-Dechêne electrical substation
Ville de Saguenay
Saguenay · 2020
Explore the project
The project
The City of Saguenay doubled the capacity of the Jean-Dechêne substation by adding two 47 MVA, 161 kV transformers and eight 25 kV outgoing feeders. The project also included complete replacement of the SCADA system and protection relays.
Our scope of work
Test the existing and newly installed equipment, verify the control and automation systems, then commission the substation at the end of the work.
Equipment involved
- Power transformers
- 161 and 25 kV circuit breakers
- Disconnect switches
- VTs and CTs
- Protection relays
The challenge
Procurement delays cut the planned testing period in half, with no extension to the deadline. Additional team members and evening and weekend work enabled the project to be delivered on time.
Supra Énergie’s contribution
- Experienced team
- Turnkey service
- Knowledge of the facility
- Flexibility
MAINTENANCE
Port de Québec
Port de Québec
Québec · 2021–2025
Explore the project
MAINTENANCE
Port de Québec
Port de Québec
Québec · 2021–2025
Explore the project
The project
At the Port de Québec, Supra Énergie provided preventive maintenance for the 25 kV network and emergency support during outages under a five-year contract tailored to the constraints of day-to-day port operations.
Our scope of work
Supra Énergie’s five-year contract covered preventive maintenance of the existing substations and their switchgear. It also included repairs, oil sampling and treatment, and emergency service in the event of an outage or equipment failure.
Equipment involved
- Power transformers
- Circuit breakers
- Disconnect switches
- Voltage and current transformers (VTs and CTs)
The challenge
The electrical network serves ships, terminals and industrial facilities. Work had to be organized at short notice to meet port operational needs and limit the impact of power outages.
Supra Énergie’s contribution
- An experienced team
- Knowledge of the facility
- Fast, advanced test equipment